TRANSFORMER

WE PRODUCE THE ENERGY OF THE WORLD

TRANSFORMER INSTALLATION

Projecting 34,5 kV energy transmission lines and making transformer facilities, turnkey assembly of power transmission lines.

TRANSFORMER, MV CELL AND CUTTER MAINTENANCE

size, importance, environment and working conditions of the transformer, the operating life of the transformer can be increased to 40 years by performing maintenance every 6 months or every year.

Services Provided During Maintenance and Testing

  • Disposal of oil changes of power and distribution transformers,
  • Transformer oil supply,
  • Y.G. NETWORK. Bushing, Gasket and Slikajel replacement,
  • Bucholz relay replacement and testing,
  • Laboratory tests of oils,
  • General cleaning
  • Link group control
  • Control and torque of LV-MV busbar and cable connections
  • Checking of personal protection connections
  • Elimination of transformer oil leaks,
  • Surface cleaning, paint control and retouching,
  • Transformer function tests,
  • Electrical control and cleaning of dry type transformers
  • Testing of transformers
  • Examination of their physical and mechanical conditions
  • Checking the tightness of the connections
  • Control of mechanical parts
  • Opening mechanism and closing mechanism maintenance
  • Lubrication of transition contacts with suitable contact lubricant
  • Cell contact carrier controls
  • Control of electrical components inside the circuit breaker, [coil, auxiliary contact etc.)
  • Circuit breaker contact input and output settings
  • Circuit breaker on/off settings
  • If necessary during the operations to be performed in our service, the cutters are completely disassembled and disassembled after cleaning and, if necessary, the cutter paint, and delivered to the company in working condition.

Tests During Maintenance

  • Power Factor test,
  • Conversion Rate test,
  • Winding Resistance test,
  • DC Isolation test,
  • Magnetizing Current tests,
  • Bushing tests,
  • Mechanical and electrical tests of the tap changer,
  • Frequency Analysis tests (FRA),
  • Dielectric Analysis tests (Dırana)
  • On-off time tests
  • Contact resistance tests
  • Insulation tests
  • SF6 gas tests

Our company provides services in this direction with its expert staff.

SPECIAL TRANSFORMER MANUFACTURING

Birci Energy manufactures special transformers according to your needs.

TRANSFORMER OIL ANALYSIS

As Birci Energy, all oil and gas analysis tests of our customers, which we maintain or take samples from, are performed in accredited TURKAK approved test laboratories.

Oil Chemical and Electrical Tests

  • Power Factor Test
  • Puncture Strength Test
  • Water Amount Test
  • Acid Amount Test
  • Internal Surface Tension Test
  • Color and Appearance Test
  • Specific Density Test
  • Furanic Compounds Test
  • Flash Point Test
  • Aniline Point Test
  • Viscosity
  • Corrosive Sulfur

Sampling Oil Dissolved Gas

  • Flash Point Test
  • Methane (CH4)
  • Hydrogen (H2)
  • Carbon dioxide (CO2)
  • Carbon monoxide (CO)
  • Ethylene (C2H4)
  • Ethane (C2H6)
  • Acetylene (C2H2)
  • Oxygen (O2)
  • Nitrogen (N2)
  • Total Dissolved Gas (ppm)
  • Total Dissolved Gas (%)